Installation Guide
iDEAL Paint Spray Booth (PSB-AFCF23ASY)
13
4.5 LIGHT FIXTURES
STANDARD LIGHTS
1. Install ‘upper & lower’ Std. Light Brackets (KP02L01-A & KP02-R01-A) above and below of panel hole, per
diagram below. Insert 5/16” bolts through wall panel holes and secure with nuts.
2. Place a 1/4” to 1/2“ bead of caulk around the edge of the light hole in the panel.
3. Install ‘sides’ Std. Light Brackets (KP02-002) to each side of panel hole, per diagram below. Insert 5/16” bolts
through wall panel holes and secure with nut.
4. Carefully, place the tempered glass centered between the Std. Light Brackets pressing it into the bead of caulk
forming a seal.
5. Carefully, place Light Fixture between the Light Brackets. Use #12 drill screws to secure Light Fixture to upper &
lower Std. Light Brackets & Panel, using provided matching holes for Brackets & Light Fixture.
6. Use #14 drill screws for curved slotted hole for upper & lower Brackets. This will allow the Light Fixtures to have
the ability to pivot, for easy access & installation to install and/or replace lamps, after upper & lower #12 drill
screws are removed.