Product Manual

13
Apr. 2019
UF-2200EH-X
6. Anchoring Lift & Pedestal Stand
a. Once Lift & Pedestal Stand placement locations are confirmed, install anchor bolts at each corner of Lift to
secure to floor, referencing the FOUNDATION and ANCHORING REQUIREMENTS info. on Page 9.
NOTE: Anchor Pedestal to floor is optional. Fig.10
7. Starting Up (No Load on Lift)
a. Using the Control Panel, first turn of the red Emergency / Master Power Switch for lift operation.
b. Raise the lift platform to full height by pressing the (GREEN) UP↑button. (Fig. 9)
c. Lower the lift to floor by pressing the (BLUE) DOWN↓button.
d. With no load on lift, cycle up and down 2 or 3 times to bleed air out of the hydraulic system. (Wait 2
minutes between lift cycles)
e. After cycling lift, raise and test latching operation by raising lift to full height, followed by pressing the
(BLACK) LOCK / STOP-DESCENT button, which will lower the lift to the next locked height position.
f. To lower lift from locked height position, press the (GREEN) UP↑for just 1 to 2 seconds, followed by
pressing the (BLUE) DOWN↓button until lift to lowers to floor.
Fig.9 Fig.10
g. During ‘Start Up’ procedure, double check for proper lift operation and for any hydraulic leaks. Once
confirmed for proper lift operation and no apparent hydraulic leaks, install the Power Unit Cover to Pedestal
Control Stand using the Screws provided. Fig.10
The Lift is now ready for Operation