Product Manual
8
May 2019
TCWB-PSC206M-iDEAL
7. POSITION & INSTALLATION
1. Unscrew the nuts at the bottom, position the machine and
calibrate it with the horizontal rule. Mount the machine with
all the screws and to ensure the machine is stable. Make
sure the system is equipped with a good grounding circuit for
prevent electric leakage. And have operation range of ground
for skid prevention.
2. Unscrew the Nut (A) on the Cabinet Body (B) as shown in
Fig 3. Lift the Column (C) and mount it on the Machine Body
(B) by using the Nut (A) through the bolt located on the
machine Body (B). If the Column becomes loose after a
period of using, retighten them immediately. Otherwise, the
result of damage to the tire may occur.
Fig 4
8. ELECTRICITY & PNEUMATIC CONNECTIONS
CAUTION: Before installation and connection, check to be sure that the electricity
power supply corresponds to the machine technical data. All the installation of electric
and pneumatic devices must be operated by a professional electrician. Connect the
compressed air connector which is on the machine right side with compressed air
system. The electric grid that the machine connects to must have fuses protection
device and good outer cover grounding protection. Install the leakage automatic air
switch on the maim power supply, leakage current is set at 30mA.
CAUTION: No power plug for this machine, the user should self-connect one power
plug no less than 16A as well as in line with the machine voltage. Or directly connect
with the power supply according to the above requirements.