Product Manual
7
May 2019
TCWB-PSC206M-iDEAL
4. TRANSPORT
When transporting, the machine should be with original package and placed according
to the mark on the package. For the already packaged machine should be handled
with a corresponding tonnage forklift for loading and unloading. The location to insert
the fork feet, as shown as Fig 1.
5. UNPACKING & INSPECTION
Pull out the nail which is nailed on the plate with tip jaw; unpack the carton and plastic
cover. Check and make sure all parts shown on the spare parts list are included. If any
parts are missing or broken, please do not use the machine and contact the
manufacturer or dealer ASAP.
Fig 1 Fig 2 Fig 3
6. WORKPLACE REQUIREMENTS
Choose workplace in compliance with safety regulations. Connect power supply and
air source according to manual and workplace must have good air condition; in order to
make the machine run well, its workplace requires at least clear space from each wall
shown as Fig 2. If installing it outdoor, it must be protected by roof against rain and
sunshine.
WARNING: the machine with motor must not be operated in explosive
atmosphere.