Product Manual
iDEAL Paint Spray Booth (PSB-SEMIDD26ASY-A)
11
NOTE: Refer to exploded view drawings included with your spray booth for installation details.
Basic Installation - First Section:
1. Determine where booth will be constructed (determine where exhaust stack will exit through the roof) and
where Side Door will be placed.
2. Use chalk lines to place booth layout on the floor.
3. Starting with rear exhaust chamber or front wall panels at either rear corner, bolt one corner panel & one rear
wall corner panel together on chalk lines.
4. Bolt opposite rear or front sidewall panel to rear wall panel on chalk lines.
5. Bolt all rear or front wall panels in place along with their wall panels.
6. Install the hip support angles (if applies) on the right and left frontal back wall panels.
7. Following exploded view drawings, continue assembling wall panels to each other and to the wall panel beam
supports (T-Bars) for the first section of booth.
8. Install the ceiling blank cross support panel between the two wall panel beam hip beams.
9. Install the two hip panels (be sure intake air flat tab is at top of panel).
10. Verify walls are plumb and section is square and on floor layout marks.
11. Square and level all panels shimming from the bottom of the panels. Be sure all joints are plumb and corners
square. Tighten all bolts and nuts as panels are squared and leveled.
12. Install roof panels on completed section, as detailed in drawings.
13. Anchor panels to floor.
14. Note: If using intake plenum/canopy box, install intake box front panel on top of front wall panel, bolting the
two side panels to the front panel. Install roof panels on top of the intake plenum/canopy box back and side wall
panels.
(See Assembly Detailed Diagrams for details)