Product Manual

iDEAL Open Front Paint Spray Booth (PSB-AFOFB1388-AK)
12
10. Following exploded view drawings, continue alternately assembling wall panels and roof panels to each other
until you reach front end of booth.
11. Verify walls are at correct angle and booth is square and on floor layout marks. Tighten all mounting hardware.
12. Anchor floor channel to floor at a minimum of every 12 inches.
13. Caulk all panel joints inside the booth with the acrylic latex caulk provided. Do not use a silicone caulk.
4.5 LIGHT FIXTURES
CLASS I DIV II LIGHTS
1. Place light fixture through booth ceiling panel and line up with mounting holes.
2. Install bolts through light and panel holes and secure using nuts on outside of ceiling panel.
3. The fixture is provided with an interlock switch that has a normally open contact, which opens when the fixture
lens is removed from fixture. The switch is to be wired to disable spray equipment used in spray booth.