Product Manual
10
MSC-18K-X
May 2019
2. SET-UP / INSTALLATION
Remark: Only move the lifting column with the forklift. Only raise the lifting column at the correct
points. Damage to lifting column and /or injury to persons may occur if the lifting column
is not moved in the correct manner.
2.1 PACKING LIST
The complete lift is a set of either two (2), four (4) or six (6) mobile column lifting units and one (1)
parts box, based on model type.
1. Each column is a self-contained unit.
2. The parts box contains: (Based on Model Type)
a) Either - One (1), Three (3) or Five (5) Communication Cable Reels.
b) Either - Eight (8), Sixteen (16) or twenty-four (24) Battery Clamps.
c) Either – One (1), Two (2) or Three (3) Sets of Combined Seal Washers and Filter
Meshes.
d) One (1) spare Electro-Magnetic Valve.
e) One (1) spare T-Connector.
f) Two (2) Keys for Column Door Interlock.
g) One (1) Magnet Ring. (Emergency Lowering Procedure)
Important document packet that includes, Installation, Operation and Maintenance Manual, ALI
Manual, “Lifting it Right”, Automotive Lift Safety Tips Placard, ALI “Lifting Points Guide”, ANSI/ALI
ALOIM:2008(R2013) Safety Requirements for Operation, Inspection and Maintenance.
Warranty Statement and Warranty Registration Instructions.
2.2 INSTALLATION REQUIREMENTS AND TOOLS / SUPPLIES
Foundation
Important
: It is the user’s responsibility to provide a satisfactory installation area for the lift. Lifts
should only be installed on level concrete floors with a minimum thickness of four inches and half
(4.5") or 114 mm. Concrete must have a minimum strength of 3000 psi and should be aged thirty (30)
days prior to installation. Please consult an architect, contractor or engineer if doubt exists as to the
strength and feasibility of the floor to enable proper lift installation and operation. Do not use on
asphalt. Do not use on a suspended floor without approval from a licensed structural engineer.
A qualified person should be consulted to address seismic loads and other local or state
requirements.