Installation guide
Figure 36 Optional J-Box Locations
OPTIONAL
J-BOX
__CATIONS
J
/
/
Representative drawing only, some models may vary in appearance.
L12F024
Remove the J-Box cover and mounting bracket from the loose
parts bag. Select a 7/8-in. (22 mm) knock-out on the desired
side of the casing. Remove the knock-out from the casing. Drill
two 1/8-in. (3 mm) pilot holes in the casing dimples by the
desired 7/8-in. (22 mm) knock-out.
Align the J-Box mounting bracket against the inside of the
casing and secure the mounting bracket with the screws. (See
Figure 37)
Electrical Box on Furnace Casing Side
NOTE: Check that duct on side of furnace will not interfere with
installed electrical box.
Figure 37
J-BOX
MOUNTING
SCREWS
1. Fasten a field-supplied external electrical box to the
outside of the casing by driving two field-supplied
screws from inside electrical box into casing. (See
Figure 38)
2. Route field power wiring into external electrical box.
3. Pull furnace power wires through 1/2-in. (12 mm)
diameter hole in J-Box. If necessary, loosen power
wires from strain-relief wire-tie on furnace wiring
harness.
4. Connect any code required external disconnect(s) to
field power wiring.
J-Box Bracket Installation
J-BOX __.
MOUNTING \\
BRACKET
\..
\
"\\
L12F025
5. Route external field power wires through holes in
electrical box and casing.
6. Connect field ground wire and factory ground wire to
green ground screw on J-Box mounting bracket as
shown in Figure 37.
7. Connect field power and neutral leads to furnace power
leads, as shown in Figure 35.
8. Attach furnace J-Box cover to mounting bracket with
screws supplied in loose parts bag. Do not pinch wires
between cover and bracket.
9. Complete external disconnect wiring and installation.
Connect line voltage leads as shown in Figure 38. Use
best practices (NEC) ANSl/NFPA 70 in U.S. for wire
bushings, strain relief, etc., and Canadian Electrical
Code CSA O22.1.
I Field-Supplied Electrical Box on
Figure 38 Furnace Casing
GROUNU
NEUTRAb
A10141
Power Cord Installation in Furnace J-Box
NOTE: Power cords must be able to handle the electrical
requirements listed in Table 11. Refer to power cord
manufacturer's listings.
1. Install J-Box mounting bracket to inside of furnace
casing. (See Figure 37)
2. Route listed power cord through 7/8-in. (22 mm)
diameter hole in casing and J-Box bracket.
3. Secure power cord to J-Box bracket with a strain relief
bushing or a connector approved for the type of cord
used.
4. Pull furnace power wires through 1/2-in. (12 mm)
diameter hole in J-Box. If necessary, loosen power wires
from strain--relief wire-tie on furnace wiring harness.
5. Connect field ground wire and factory ground wire to
green ground screw on J-Box mounting bracket as
shown in Figure 37.
6. Connect power cord power and neutral leads to furnace
power leads as shown in Figure 35.
7. Attach furnace J-Box cover to mounting bracket with
screws supplied in loose parts bag. Do not pinch wires
between cover and bracket.
BX Cable Installation in Furnace J-Box
1. Install J-Box mounting bracket to inside of furnace
casing.
30 Specifications subject to change without notice. 440 01 4201 03










