Installation Sheet

3
DO
Check resistance before, during and after
installation. (use digital OHM meter)
Use circuit fault detector throughout installation.
Screw and thin set down cement backer board as
per manufacturers specifications
Ensure floor surface is dust free.
Install finished flooring as soon as possible after
heating system is installed.
Install & provide power in accordance with your
local electrical codes and standards.
Register your heating system at www.icobath.com/
cosyfloor-warranty to retain your lifetime warranty.
Ensure the mat is completely encapsulated in
thinset mortar or self-leveling cement prior to
installing flooring.
DON’T
Forget to install heat sensor wire included with
thermostat.
Install heating cables closer than 6” to toilet flange.
Scrape, sand, or sever wires in any way.
Bang trowel or other sharp object on floor.
Install cables closer than 2” to each other.
Cross cables, thermostat sensor, or power lead.
Use knife to clean grout lines.
Open splices, cut or modify cable in any way.
installers tips