Installation Guide
2
installer’s tips
DO
□
Check resistance before, during and after
installation. (use digital OHM meter)
□
Use heatmat monitor throughout installation.
□
Screw and thin set down cement backer board or
CosyBoard as per manufacturer’s specifications
– visit www.icocanada.com for more information
about recommended insulated CosyBoard.
□
Apply reinforcing joint tape at seams. (or follow
manufacturer’s recommendations)
□
Ensure floor surface is dust free.
□
Install finished flooring as soon as possible after
heating system is installed.
□
Install & provide power in accordance with your
local electrical codes and standards.
□
Register your heating system to retain your lifetime
warranty.
□
Ensure the mat is completely encapsulated in
thinset mortar or self-leveling cement prior to
installing flooring.
DON’T
□
Forget to install heat sensor wire included with
thermostat.
□
Install heating cables closer than 6” to toilet flange.
□
Scrape, sand, or sever wires in any way.
□
Bang trowel or other sharp object on floor.
□
Install cables closer than 2” to each other.
□
Cross cables, thermostat sensor, or power lead.
□
Use knife to clean grout lines.
□
Open splices, cut or modify cable in any way.








