K10 Rotary vane vacuum pump Please read the User Manual carefully before use, and follow all operating and safety instructions! user manual english
User Manual K10 series Rotary vane vacuum pump, 127 l/min, 0,1 torr Important notice This instrument is designed for laboratory usage only. Please read this manual carefully before installing or operating this equipment. The instrument shall not be modified in any way. Any modification will void the warranty and may result in potential hazard. We are not responsible for any injury or damage caused by any non-intended purposes and modifying the instrument without authorization.
Assembly and disassembly diagram Installation 1. Ensure to check voltage specified on the nameplate at the bottom of the pump. Make sure if it matches the line voltage on your location. 2. Install the pump in a clean, dust-less and ventilated area where the ambient under 40℃. 3. Connect (4) air inlet with a high-pressure hose as short as possible and check if all the connections are tightly sealed and without air leakage. 4.
Operation 1. Turn on (1) the power switch and run the pump for 1 min. then check through (3) oil level window if the current oil level is between Max. and Min. line. • If under Min. line then make sure to add lubricant (VACU-KLB-500). • Steps for addition of the lubricant: screw off (2) oil filler cap then pour the lubricant into tanker cautiously and ensure the oil level is not above Max. line. Otherwise, it can spray much oil mist while the pump is in operation. 2.
www.labbox.