Hub/Switch Installation Guide
Chapter 8 Initial Startup and Verification
HPSS Installation Guide September 2002 465
Release 4.5, Revision 2
8.3 Unlocking the PVL Drives
Asadefault,allnewlyconfigureddrives arelocked.TheymustbeunlockedbeforethePVLcanuse
them. Refer to Section Section 5.5.1: Unlocking a Drive on page 102 of the HPSS Management Guide
for more information.
8.4 Creating HPSS Storage Space
Adding storage space in HPSS is done in two distinct phases: import and create. The first phase,
import, involvesphysicallyintroducing the tape cartridgesandthediskvolumes intothe PVLand
labeling them with HPSS volume labels. The second phase, create, defines the Storage Server data
structures that will describe the data stored on the imported volumes.
Refer to Section3.1: CreatingHPSSStorage Space (page 53)in the HPSS Management Guidefor more
information on creating HPSS storage space.
8.5 Create Additional HPSS Users
Refer to Section 8.1.1: Adding HPSS Users on page 215 of the HPSS Management Guide for more
information on how to create additional HPSS users.
8.6 Creating File Families
Refer to Section 6.7.4: File Family Configuration (page 322) for more information on how to create
file families.
8.7 Creating Filesets and Junctions
SSM can be used to create XDSM/HPSS (which includes both DFS/HPSS and XFS/HPSS) and
HPSS-only filesets. SSM can also be used to create the junctions that link the filesets to the HPSS
name space.
Before creating XDSM/HPSS filesets, DFS must already be configured (if it is to be used), and
the procedures to set up the DFS and XFS filesets and file systems must already be performed.
Refer to Section 7.6: HDM Configuration on page 435 for more information.
Ensure that the Name Server and the DMAP Gateway are up and running before creating the
filesets and junctions. Also ensure that SSM is connected to both of the servers.