Hub/Switch Installation Guide
Chapter 3 System Preparation
204 September 2002 HPSS Installation Guide
Release 4.5, Revision 2
◆ Disaster recovery requirements
◆ Disaster recovery test plan
• Pre-Production Test Plan, including:
◆ Customer's requirements (users, admin, management, and operations staff) for the
production storage system considering all involved hardware and software, which
mayincludedetailedrequirementsinone ormoreofthefollowingareasdependingon
customer requirements:
➢ Functionality
➢ Single-transfer performance
➢ Aggregate performance
➢ Maximum number of concurrent requests
➢ System reliability given a specific loading profile over a specific period of time
➢ Interoperability with other software
◆ Test procedures to verify that, when successfully executed, will prove that the above
expectations will be satisfied once the entire mass storage system (software and
hardware) is put into production.
• Hardware and prerequisite software support arrangements, including vendor and
customer id numbers and procedures for obtaining hardware, AIX, DCE, Encina, and
Sammi support.
Thematerial canbe placedon theweb foreasyaccessibilitybyallreviewparticipants.Thematerial
should be made available to all reviewers at least 2 days prior to the review.