- Hewlett-Packard SAN Switch Installation Guide
Apply power to t
he switch and lo g in
Once a serial connection is established, apply power to the switch:
1. Connect the power cord to a power inlet on the switch and a power source, as
shown in Figur
e21.
NOTE:
The 4/32, 4/32
B and 4/64 SAN Switch models use two power cords.
The 4/8 and 4/16 SAN Switches use one power cord.
0015b
!
IO
I
O
I
A
TT
EN
T
IO
N
:
M
ax
imu
m screw l
ength
for
ra
ck
mou
nting
to
be
5m
m
or 13
/64
in.
Figure 21 Connecting the power cord
NOTE:
To protect against AC failure on the 4/32, 4/32B and 4/6 4 SAN Switch
models, connect each power cord to outlets on separate circuits. Verify
that the cords have a minimum service loop of 6-inches to avoid stress.
2. To power on, set the two AC switches to the ON position (I).
IMPORTANT:
The 4/8 and 4/16 SAN Switches utilize one power switch. The 4/32,
4/32B and 4/64 SAN Switches utilize two power switches.
The power supply LED lights green and the switch runs the power-on self test (POST).
The switch requires at least three minutes to boot and complete POST.
3. After POST and the bo ot process are completed, verify that the System Status and
System P ower LEDs light green.
56