Datasheet
IBM Europe, Middle East, and Africa Hardware
Announcement ZG12-0119
IBM is a registered trademark of International Business Machines Corporation
20
use a UTP cable with RJ-45 connectors at both ends. For 100/1000 Mbps operation,
Category 5 cabling must be used. For 10 Mbps operation, Category 3, or better,
cabling must be used.
There are no additional cabling requirements, other than for system power,
keyboard, mouse, and monitor connections.
Installability
The x3750 M4 server requires about 40 minutes for installation. Installation includes
unpacking, setting up, and powering on the system. Additional time is required to
install an operating system, additional adapters, or features.
Packaging
Number of
Product Shipment group boxes
IBM System x3750 M4 System unit carton 1
Contents:
System unit
Rack kits (two sets):
Rails
Cable management hardware
IBM System x3750 M4 Country kit carton 1
Contents:
Two 2.8m 220 V intra-rack cables
Safety booklet
CD-ROM Packages
IBM Systems Director
CD-ROM Packages
Active Energy Manager
On/off switch cover
The x3750 M4 systems are shipped as a single package. The country kit carton
is contained inside the top portion of the system unit carton, while the rack
components are contained in the system unit carton.
The IBM System x3750 M4 Types 8722 and 8733 Installation and Service Guide, in
US English, is available from our website.
The Warranty Information publication will be available as a hardcopy publication at
http://www.ibm.com/systems/support
Related options
Processor upgrades
• Xeon processor
• Installation publications/warranty
Supplies
None
Security, auditability, and control
Security and auditability features include:
• Power-on and privileged access password functions provide controls of who has
access to the data and server setup program on the server.