Operation and maintenance manual
www.changlin.com.cn
144/167
pages
Caution: To prevent bearing damage
newtubochargers must be prelubricated before
start-up.
Pour 50 to 60 [2 to 3 ounces] of clean engine oil
into the oil supply fitting. Rotate the turbine wheel
to allow the oil to enter the bearing housing.
Install the exhaust oulet connection.
Do not tighten the two mounting capscrews until
the band clamp has been tightened.
Torque Value: Band Clamp-8 N * m [6 ft-lb]
Capscrews - 43 N*m [32 ft-lb]
16 mm
Install the oil supply line.
Torque Value: 15N*m [11 ft-lb]
If equipped with a wastegate turbocharger, install
the intake manifold pressure supply line from the
boost capsule.










