Operation and maintenance manual

www.changlin.com.cn
143/167
pages
Position the turbocharger drain hose to connect the
drain tubes; tighten the clamps.
13 mm. Punch, Hammer
If loosened, tighten the turbine housing capscrews.
Bend the lockplates onto the flats to prevent
loosening.
Torque Value: 11.3 N • m [8 ft-lb]
10 mm
If required, loosen the compressor housing and
position the housing to align with the crossover
tube.
Torque Value: 5.7 N*m [50 in-lb]
11 mm, plastic Hammer
Tighten the band clamp to 5.7 N • m [50 in-lb].
Tap around the clamp with a plastic hammer and tighten
again to 5.7 N • m [50 in-lb].