Operation and maintenance manual
www.changlin.com.cn
136/167
pages
10 mm
Install the cover and a new gasket.
Torque Value: 24 N*m [18 ft-lbl
Assemble the intake piping and connect the cold
starting aid if used.
Install and bleed the high pressure fuel lines.
Jacket‐WaterAftercoolerandGasket‐Replacement
Preparatory Steps:
• Disconnect the cold starting aid , if used.
• Remove the air crossover tube.
• Remove high pressure fuel lines.
• Drain 2 liters (2.1 U.S. Quarts) of coolant.