Operation and maintenance manual

www.changlin.com.cn
124/167
pages
Injectors-Replacement
Preparatory Steps:
Thoroughly clean around the injectors.
Remove the high pressure fuel lines.
Remove the fuel drain manifold.
24 mm
Remove the injectors.
InjectorBoreBrush
Clean the injector nozzle bore, using Service Tool No.
3822509.
Lubricate the sealing lips of the sleeve with anti-seize
compound. Package the injector, sealing sleeve, a new
copper sealing washer and the hold down clamp.
Use only one washer
Service Tip: A light coat of clean 15W40 engine oil between
the washer and injector can help to keep the washer from
falling during installation.