Operation and maintenance manual
www.changlin.com.cn
123/167
pages
FuelDrainManifold‐Replacement
Preparatory Steps:
• Clean debris.
10 mm
Remove the drain line banjo capscrew from the
fuel filter head. Remove the capscrew from the
bracket on the intake cover.
Remove the banjo capscrews from the injectors.
NOTE: Use new seals and sealing washers.
Assemble the drain line and fuel drain manifold in the
reverse order of removal.
Torque Value:
(Banjo fitting screw) 15 N• m [11 ft-lb]
(Banjo fitting) 9N•m [7 ft-lb]
(Bracket Capscrew) 24 N • m [18 ft-lb]