User's Manual
Table Of Contents
- 1 Notes on the document
- 2 Safety regulations
- 3 Product description
- 3.1 Constituents
- 3.1.1 Voltage supply and alarming system
- 3.1.1.1 Terminal block
- 3.1.1.2 Expansion for VAC voltage supply (VAC voltage supply unit)
- 3.1.1.3 Alarm system expansion
- 3.1.1.4 SC200 - optional (VAC or alarm system expansion)
- 3.1.1.5 Alarm input/output module - optional (VAC or alarm system expansion)
- 3.1.1.6 Rectifier module - optional (VAC expansion)
- 3.1.2 E1 connection board
- 3.1.3 Redundancy package with LAN Routing Unit (LRU)
- 3.1.4 On/off switch
- 3.1.5 TIB transceiver module (TETRA Indoor Base)
- 3.1.6 Antenna Coupling System (ACS)
- 3.1.7 Fan unit
- 3.1.8 Cavity coupler (only for the Cavity variant)
- 3.1.9 Redundancy options for the DIB-500 R4.1 or the Base Station Function (BSF)
- 3.1.1 Voltage supply and alarming system
- 3.2 Interfaces
- 3.3 Wiring diagrams
- 3.4 Scope of delivery
- 3.1 Constituents
- 4 Transport and storage
- 5 Setup and commissioning
- 5.1 Safety measures and prerequisites
- 5.2 Tools, aids and materials
- 5.3 Installing equipment racks
- 5.4 Removing the top cover of the mounting frame
- 5.5 Connecting equipment racks (as of 5 carriers)
- 5.6 Connection to the electrical system
- 5.7 Connecting Ethernet cables
- 5.8 Installing the GPS antenna
- 5.9 Installing the GPS protector - optional
- 5.10 Connecting antennas
- 5.11 Connecting external alarm sensors (LSA+)
- 5.12 Connecting external alarms - optional, with VAC or alerting expansion
- 5.13 Mounting the top cover of the equipment rack
- 5.14 Switching on the voltage source
- 5.15 Switching on the DIB-500 R4.1
- 6 Configuration
- 6.1 Configuring the software
- 6.1.1 Work equipment
- 6.1.2 Preparatory measures
- 6.1.3 Deleting the ARP buffer
- 6.1.4 Configuring and generating network configurations via the NMC-515 ConfigurationManager
- 6.1.5 Creating the download repository
- 6.1.6 Adapting IP addresses (with more than one transceiver module)
- 6.1.7 Performing an initial download via NMC-522 DownloadManager
- 6.2 Adjusting a cavity coupler - optional (cavity variant only)
- 6.3 Concluding tasks
- 6.1 Configuring the software
- 7 Function tests and operating surveillance
- 8 Service interruption
- 9 Recommissioning
- 10 Maintenance
- 11 Component replacement
- 11.1 Safety measures and prerequisites
- 11.2 Overview of replacement components and tools, aids and materials
- 11.2.1 Replacing the TIB transceiver module (tools and aids)
- 11.2.2 Replacing the ACS (tools and aids)
- 11.2.3 Replacing components of the fan unit (tools, aids and materials)
- 11.2.4 Replacing the LRU (tools and aids)
- 11.2.5 Replacing the top hat rail power supply unit (tools and aids)
- 11.2.6 Replacing components of the mounting frame/the voltage supply unit (tools, aids and materials)
- 11.2.7 Replacing cavity couplers (tools and aids)
- 11.2.8 Replacing the GPS protector (tools and aids)
- 11.3 Replacing the TIB
- 11.4 Replacing the ACS
- 11.5 Replacing fan unit constituents
- 11.6 Replacing the LRU - optional (redundancy package)
- 11.7 Replacing the top hat rail - optional (redundancy package)
- 11.8 Replacing components of the VAC and alarm system expansion - optional
- 11.9 Replacing cavity couplers - optional (cavity variants only)
- 11.10 Replacing the GPS protector - optional
Installation, Operation and Service Manual 90DIB500R41IM_FCC02 – 99.1 89
DIB-500 R4.1 Setup and commissioning
5 Setup and commissioning
This chapter describes the setup and commissioning of the DIB-500 R4.1 product. The
safety measures to be followed and prerequisites for the corresponding tasks are
described in section 5.1 on page 90. The required tools, auxiliaries and materials are
described in section 5.2 on page 90.
The tasks listed in the following table must be performed for setting up the
DIB-500 R4.1.
Table 5.1 Overview of the tasks to be performed (Setup and commissioning)
Tasks/work steps Described in
Installing equipment racks Section 5.3 on
page 92
Removing the top cover of the mounting frame Section 5.4 on
page 94
Connecting equipment racks
(as of 5 carriers)
Assembly of the redundancy package – optional Section 5.5.1 on
page 96
Installing the left top hat rail
end bracket
Section 5.5.1.1
on page 97
Establishing the voltage sup-
ply of the LRU
Section 5.5.1.2
on page 98
Inserting the LRU Section 5.5.1.3
on page 102
Installing the top hat rail
power supply unit
Section 5.5.1.4
on page 103
Installing the right top hat rail
end bracket
Section 5.5.1.5
on page 105
Connecting the equipment racks A and B Section 5.5.2 on
page 105
Connection to the electrical
system
Connection with the grounding system Section 5.6.1 on
page 107
Defining the reference potential Section 5.6.2 on
page 108
Connecting the voltage supply Section 5.6.3 on
page 110
Connecting the VDC voltage
supply
Section 5.6.3.1
on page 110
Connecting the VAC voltage
supply – optional
Section 5.6.3.2
on page 112
Connecting Ethernet cables Section 5.7 on
page 113
Installing the GPS antenna Section 5.8 on
page 114
Installing the GPS protector - optional Section 5.9 on
page 117
Connecting antennas Connecting antennas (GPS and TETRA) Section 5.10.1 on
page 119
Connection of external antenna coupling systems – Option-
ally, only FlexibleTx variant
Section 5.10.2 on
page 121
Connecting external alarm sensors (LSA+) Section 5.11 on
page 123