User's Manual

Table Of Contents
DIB-500 R4.1 Component replacement
Replacing components of the VAC and alarm system expansion – optional
208 Installation, Operation and Service Manual 90DIB500R41IM_FCC02 99.1
Proceed as follows to mount a plug/plugs with earthing contact:
Preparation:
The network element must have been put out of operation temporarily, refer to sec-
tion 8.1 on page 163.
Carry out the following steps:
Mount the plug(s) with earthing contact on the corresponding voltage supply
cable(s) using the tool required for this purpose.
You have successfully mounted a plug/plugs with earthing contact.
11.8.2.4 Configuring the SC200
To ensure proper operation of the SC200, it must be configured accordingly. Following
the configuration of the IP settings, all the other configuration parameters can be loaded
via the "SC200-def_cfg_XXXX-XX-XX.dcc" (XXXX-XX-XX corresponds to the date)
configuration file of the S200.
When delivered as a spare part, the SC200 will not yet be configured. In this case, you
have to perform the configuration tasks described below.
Table 11.29 describes the possible states of the SC200. Depending on the configuration
level, the SC200 needs to be configured following a replacement of the mounting frame.
The tasks listed in the following table must be performed for the configuration of the
SC200.
Table 11.29 State of the replacement component
State Configuration required
Spare part x
Replacement part, e. g. from an already available
DIB-500 R4.1 system
---
Table 11.30 Overview of the tasks to be performed (Configuring the SC200)
Tasks/work steps Described in
Installing the "DCTools" application on page 209
Configuring the orientation of the SC200 display window (local) on page 209
Configuring IP settings of the SC200 (local) on page 211
Loading the SC200 configuration file (via the "DCTools" application) on page 213
Uninstalling the "DCTools" application on page 218