User's Manual
Table Of Contents
- 1 Notes on the document
- 2 Safety regulations
- 3 Product description
- 3.1 Constituents
- 3.1.1 Voltage supply and alarming system
- 3.1.1.1 Terminal block
- 3.1.1.2 Expansion for VAC voltage supply (VAC voltage supply unit)
- 3.1.1.3 Alarm system expansion
- 3.1.1.4 SC200 - optional (VAC or alarm system expansion)
- 3.1.1.5 Alarm input/output module - optional (VAC or alarm system expansion)
- 3.1.1.6 Rectifier module - optional (VAC expansion)
- 3.1.2 E1 connection board
- 3.1.3 Redundancy package with LAN Routing Unit (LRU)
- 3.1.4 On/off switch
- 3.1.5 TIB transceiver module (TETRA Indoor Base)
- 3.1.6 Antenna Coupling System (ACS)
- 3.1.7 Fan unit
- 3.1.8 Cavity coupler (only for the Cavity variant)
- 3.1.9 Redundancy options for the DIB-500 R4.1 or the Base Station Function (BSF)
- 3.1.1 Voltage supply and alarming system
- 3.2 Interfaces
- 3.3 Wiring diagrams
- 3.4 Scope of delivery
- 3.1 Constituents
- 4 Transport and storage
- 5 Setup and commissioning
- 5.1 Safety measures and prerequisites
- 5.2 Tools, aids and materials
- 5.3 Installing equipment racks
- 5.4 Removing the top cover of the mounting frame
- 5.5 Connecting equipment racks (as of 5 carriers)
- 5.6 Connection to the electrical system
- 5.7 Connecting Ethernet cables
- 5.8 Installing the GPS antenna
- 5.9 Installing the GPS protector - optional
- 5.10 Connecting antennas
- 5.11 Connecting external alarm sensors (LSA+)
- 5.12 Connecting external alarms - optional, with VAC or alerting expansion
- 5.13 Mounting the top cover of the equipment rack
- 5.14 Switching on the voltage source
- 5.15 Switching on the DIB-500 R4.1
- 6 Configuration
- 6.1 Configuring the software
- 6.1.1 Work equipment
- 6.1.2 Preparatory measures
- 6.1.3 Deleting the ARP buffer
- 6.1.4 Configuring and generating network configurations via the NMC-515 ConfigurationManager
- 6.1.5 Creating the download repository
- 6.1.6 Adapting IP addresses (with more than one transceiver module)
- 6.1.7 Performing an initial download via NMC-522 DownloadManager
- 6.2 Adjusting a cavity coupler - optional (cavity variant only)
- 6.3 Concluding tasks
- 6.1 Configuring the software
- 7 Function tests and operating surveillance
- 8 Service interruption
- 9 Recommissioning
- 10 Maintenance
- 11 Component replacement
- 11.1 Safety measures and prerequisites
- 11.2 Overview of replacement components and tools, aids and materials
- 11.2.1 Replacing the TIB transceiver module (tools and aids)
- 11.2.2 Replacing the ACS (tools and aids)
- 11.2.3 Replacing components of the fan unit (tools, aids and materials)
- 11.2.4 Replacing the LRU (tools and aids)
- 11.2.5 Replacing the top hat rail power supply unit (tools and aids)
- 11.2.6 Replacing components of the mounting frame/the voltage supply unit (tools, aids and materials)
- 11.2.7 Replacing cavity couplers (tools and aids)
- 11.2.8 Replacing the GPS protector (tools and aids)
- 11.3 Replacing the TIB
- 11.4 Replacing the ACS
- 11.5 Replacing fan unit constituents
- 11.6 Replacing the LRU - optional (redundancy package)
- 11.7 Replacing the top hat rail - optional (redundancy package)
- 11.8 Replacing components of the VAC and alarm system expansion - optional
- 11.9 Replacing cavity couplers - optional (cavity variants only)
- 11.10 Replacing the GPS protector - optional
Installation, Operation and Service Manual 90DIB500R41IM_FCC02 – 99.1 173
DIB-500 R4.1 Component replacement
Overview of replacement components and tools, aids and materials
11.2.2 Replacing the ACS (tools and aids)
Table 11.3 provides an overview of tools and aids that are required for replacing the
ACS.
11.2.3 Replacing components of the fan unit (tools, aids and materials)
Table 11.4 provides an overview of tools, aids and materials that are required for replac-
ing components of the fan unit.
11.2.4 Replacing the LRU (tools and aids)
Table 11.5 provides an overview of tools and aids that are required for replacing the
LRU.
11.2.5 Replacing the top hat rail power supply unit (tools and aids)
Table 11.6 provides an overview of tools and aids that are required for replacing the top
hat rail power supply unit.
Table 11.3 Overview of tools and aids (replacing the ACS)
Work step Tools, aids
Replacing the ACS | Torx screwdriver size TX25
| Flat-bladed screwdriver size 0.6 x 3.5
| Wrench size 8
| Wrench size 19
| Size 8 dynamometric key with a torque of 0.6 Nm
| Size 19 dynamometric key with a torque of 1 Nm
Table 11.4 Overview of tools, aids and materials (replacing components of the fan unit)
Work step Tools, auxiliaries Materials
Replacing the air filter pad --- | new air filter pad
Replacing the fan subrack | Torx screwdriver size TX20 ---
Table 11.5 Overview of tools and aids (replacing the LRU)
Work step Tools, auxiliaries
Removing the top
cover of the equipment
rack
| Phillips head screwdriver size PH2
| Coin to unscrew/tighten the mounting screws of the equipment
rack top cover
Table 11.6 Overview of tools and aids (replacing the top hat rail power supply unit)
Work step Tools, auxiliaries
Removing the top cover of the
equipment rack
| Phillips head screwdriver size PH2
| Coin to unscrew/tighten the mounting screws of the
equipment rack top cover
Replacing the top hat rail power
supply unit – optional, only variants
with redundancy package
| Flat-bladed screwdriver size 0.8 x 2.5
| Flat-bladed screwdriver size 0.8 x 4