User's Manual

Table Of Contents
DIB-500 R4.1 Configuration
Concluding tasks
150 Installation, Operation and Service Manual 90DIB500R41IM_FCC02 99.1
6.3 Concluding tasks
Once you have successfully completed the visual inspection via the SMT, you must
restore the proper operational state of the product.
Proceed as follows to restore the operating condition
Preparation:
The network element must have been put out of operation temporarily, refer to sec-
tion 8.1 on page 163.
The tools, auxiliary means and materials specified must be available, refer to
section 6.1.1 on page 132.
Carry out the following steps:
1. Reconnect the connecting cables to the RJ-45 or LSA+ terminal block on the E1
connection board.
2. If necessary, reattach the Ethernet cables that are intended for the connection to
the Ethernet interfaces of the TIB transceiver module.
3. If necessary, reinstall the covers of the equipment rack.
4. Put the network element into operation again, refer to section 9.1 on page 167.
You have restored the proper operating condition of the product.