User's Manual
Table Of Contents
- 1 Notes on the document
- 2 Safety regulations
- 3 Product description
- 3.1 Constituents
- 3.1.1 Voltage supply and alarming system
- 3.1.1.1 Terminal block
- 3.1.1.2 Expansion for VAC voltage supply (VAC voltage supply unit)
- 3.1.1.3 Alarm system expansion
- 3.1.1.4 SC200 - optional (VAC or alarm system expansion)
- 3.1.1.5 Alarm input/output module - optional (VAC or alarm system expansion)
- 3.1.1.6 Rectifier module - optional (VAC expansion)
- 3.1.2 E1 connection board
- 3.1.3 Redundancy package with LAN Routing Unit (LRU)
- 3.1.4 On/off switch
- 3.1.5 TIB transceiver module (TETRA Indoor Base)
- 3.1.6 Antenna Coupling System (ACS)
- 3.1.7 Fan unit
- 3.1.8 Cavity coupler (only for the Cavity variant)
- 3.1.9 Redundancy options for the DIB-500 R4.1 or the Base Station Function (BSF)
- 3.1.1 Voltage supply and alarming system
- 3.2 Interfaces
- 3.3 Wiring diagrams
- 3.4 Scope of delivery
- 3.1 Constituents
- 4 Transport and storage
- 5 Setup and commissioning
- 5.1 Safety measures and prerequisites
- 5.2 Tools, aids and materials
- 5.3 Installing equipment racks
- 5.4 Removing the top cover of the mounting frame
- 5.5 Connecting equipment racks (as of 5 carriers)
- 5.6 Connection to the electrical system
- 5.7 Connecting Ethernet cables
- 5.8 Installing the GPS antenna
- 5.9 Installing the GPS protector - optional
- 5.10 Connecting antennas
- 5.11 Connecting external alarm sensors (LSA+)
- 5.12 Connecting external alarms - optional, with VAC or alerting expansion
- 5.13 Mounting the top cover of the equipment rack
- 5.14 Switching on the voltage source
- 5.15 Switching on the DIB-500 R4.1
- 6 Configuration
- 6.1 Configuring the software
- 6.1.1 Work equipment
- 6.1.2 Preparatory measures
- 6.1.3 Deleting the ARP buffer
- 6.1.4 Configuring and generating network configurations via the NMC-515 ConfigurationManager
- 6.1.5 Creating the download repository
- 6.1.6 Adapting IP addresses (with more than one transceiver module)
- 6.1.7 Performing an initial download via NMC-522 DownloadManager
- 6.2 Adjusting a cavity coupler - optional (cavity variant only)
- 6.3 Concluding tasks
- 6.1 Configuring the software
- 7 Function tests and operating surveillance
- 8 Service interruption
- 9 Recommissioning
- 10 Maintenance
- 11 Component replacement
- 11.1 Safety measures and prerequisites
- 11.2 Overview of replacement components and tools, aids and materials
- 11.2.1 Replacing the TIB transceiver module (tools and aids)
- 11.2.2 Replacing the ACS (tools and aids)
- 11.2.3 Replacing components of the fan unit (tools, aids and materials)
- 11.2.4 Replacing the LRU (tools and aids)
- 11.2.5 Replacing the top hat rail power supply unit (tools and aids)
- 11.2.6 Replacing components of the mounting frame/the voltage supply unit (tools, aids and materials)
- 11.2.7 Replacing cavity couplers (tools and aids)
- 11.2.8 Replacing the GPS protector (tools and aids)
- 11.3 Replacing the TIB
- 11.4 Replacing the ACS
- 11.5 Replacing fan unit constituents
- 11.6 Replacing the LRU - optional (redundancy package)
- 11.7 Replacing the top hat rail - optional (redundancy package)
- 11.8 Replacing components of the VAC and alarm system expansion - optional
- 11.9 Replacing cavity couplers - optional (cavity variants only)
- 11.10 Replacing the GPS protector - optional
DIB-500 R4.1 Configuration
Configuring the software
138 Installation, Operation and Service Manual 90DIB500R41IM_FCC02 – 99.1
10. Enter the following command to delete the corresponding line:
x
11. Enter the following command to insert a corresponding figure:
I
12. Navigate to the end of the line with the arrow keys and enter the corresponding fig-
ure, see 135.
13. Enter the following command to change to the main menu:
Esc
14. Enter the following command and confirm your entry with the Enter key:
:wq
➥ The changes will be saved and the configuration file closed.
15. Enter the following command to restart the network service of the component:
/etc/init.d/network restart
➥ The changed IP address will take effect.
➥ The SSH connection via "PuTTY" will be changed because the IP address has
changed.
Checking the IP address – (optionally)
If required, check the IP address by establishing an SSH connection via PuTTY. You
can also check whether the IP address can be reached by entering the command ping
10.255.25x.xxx. 255.25x.xxx corresponds to the respective IP address.
16. If required, proceed analogously for any further IP addresses.
✓ The procedure for adapting the IP address has been completed.
6.1.6.2 Adapting the IP addresses (PowerPC)
For the proper operation of the PowerPC, the IP address/es of the PowerPC must be
adapted after the IP address of the IntelPC (refer to section 6.1.6.1 on page 135) has
been adapted.
Table 6.9 describes the IP addressing scheme, according to which the IP addresses of
the PowerPCs of the transceiver modules of base stations are to be assigned.
The procedure for adapting the IP address is described in the following.
Table 6.9 Transceiver module IP addressing scheme (PowerPC)
First
transceiver module
Second
transceiver module
Third
transceiver module
Fourth
transceiver module
10.255.255.17 10.255.255.18 10.255.255.19 10.255.255.20