User's Manual
Table Of Contents
- 1 Notes on the document
- 2 Safety regulations
- 3 Product description
- 3.1 Constituents
- 3.1.1 Voltage supply and alarming system
- 3.1.1.1 Terminal block
- 3.1.1.2 Expansion for VAC voltage supply (VAC voltage supply unit)
- 3.1.1.3 Alarm system expansion
- 3.1.1.4 SC200 - optional (VAC or alarm system expansion)
- 3.1.1.5 Alarm input/output module - optional (VAC or alarm system expansion)
- 3.1.1.6 Rectifier module - optional (VAC expansion)
- 3.1.2 E1 connection board
- 3.1.3 Redundancy package with LAN Routing Unit (LRU)
- 3.1.4 On/off switch
- 3.1.5 TIB transceiver module (TETRA Indoor Base)
- 3.1.6 Antenna Coupling System (ACS)
- 3.1.7 Fan unit
- 3.1.8 Cavity coupler (only for the Cavity variant)
- 3.1.9 Redundancy options for the DIB-500 R4.1 or the Base Station Function (BSF)
- 3.1.1 Voltage supply and alarming system
- 3.2 Interfaces
- 3.3 Wiring diagrams
- 3.4 Scope of delivery
- 3.1 Constituents
- 4 Transport and storage
- 5 Setup and commissioning
- 5.1 Safety measures and prerequisites
- 5.2 Tools, aids and materials
- 5.3 Installing equipment racks
- 5.4 Removing the top cover of the mounting frame
- 5.5 Connecting equipment racks (as of 5 carriers)
- 5.6 Connection to the electrical system
- 5.7 Connecting Ethernet cables
- 5.8 Installing the GPS antenna
- 5.9 Installing the GPS protector - optional
- 5.10 Connecting antennas
- 5.11 Connecting external alarm sensors (LSA+)
- 5.12 Connecting external alarms - optional, with VAC or alerting expansion
- 5.13 Mounting the top cover of the equipment rack
- 5.14 Switching on the voltage source
- 5.15 Switching on the DIB-500 R4.1
- 6 Configuration
- 6.1 Configuring the software
- 6.1.1 Work equipment
- 6.1.2 Preparatory measures
- 6.1.3 Deleting the ARP buffer
- 6.1.4 Configuring and generating network configurations via the NMC-515 ConfigurationManager
- 6.1.5 Creating the download repository
- 6.1.6 Adapting IP addresses (with more than one transceiver module)
- 6.1.7 Performing an initial download via NMC-522 DownloadManager
- 6.2 Adjusting a cavity coupler - optional (cavity variant only)
- 6.3 Concluding tasks
- 6.1 Configuring the software
- 7 Function tests and operating surveillance
- 8 Service interruption
- 9 Recommissioning
- 10 Maintenance
- 11 Component replacement
- 11.1 Safety measures and prerequisites
- 11.2 Overview of replacement components and tools, aids and materials
- 11.2.1 Replacing the TIB transceiver module (tools and aids)
- 11.2.2 Replacing the ACS (tools and aids)
- 11.2.3 Replacing components of the fan unit (tools, aids and materials)
- 11.2.4 Replacing the LRU (tools and aids)
- 11.2.5 Replacing the top hat rail power supply unit (tools and aids)
- 11.2.6 Replacing components of the mounting frame/the voltage supply unit (tools, aids and materials)
- 11.2.7 Replacing cavity couplers (tools and aids)
- 11.2.8 Replacing the GPS protector (tools and aids)
- 11.3 Replacing the TIB
- 11.4 Replacing the ACS
- 11.5 Replacing fan unit constituents
- 11.6 Replacing the LRU - optional (redundancy package)
- 11.7 Replacing the top hat rail - optional (redundancy package)
- 11.8 Replacing components of the VAC and alarm system expansion - optional
- 11.9 Replacing cavity couplers - optional (cavity variants only)
- 11.10 Replacing the GPS protector - optional
Installation, Operation and Service Manual 90DIB500R41IM_FCC02 – 99.1 131
DIB-500 R4.1 Configuration
Configuring the software
6 Configuration
The following chapter describes the procedure for the proper configuration of the prod-
uct. The product is already configured upon delivery. After a component replacement or
due to project-specific circumstances, it may still be necessary to perform configuration
steps.
The tasks listed in the following table must be performed for the configuration of the
DIB-500 R4.1.
6.1 Configuring the software
Prerequisite for configuring the network element (as a preparatory measure for the net-
work-specific configuration of the network with the aid of the NMC-515 Configuration-
Manager network management client) is the completed commissioning of the network
element, see chapter 5 on page 89.
The tasks listed in the following table must be performed for the configuration of the
software.
Table 6.1 Overview of the tasks to be performed
Tasks/work steps Described in
Configuring the software Preparatory measures Switching on the voltage
source
Section 6.1.2 on
page 132
Switching on the
DIB-500 R4.1
Connecting the service com-
puter to the TIB transceiver
module
Deleting the ARP buffer Section 6.1.3 on
page 134
Configuring and generating network configurations via the
NMC-515 ConfigurationManager
Section 6.1.4 on
page 134
Creating the download repository Section 6.1.5 on
page 135
Adapting IP addresses (with more than one transceiver mod-
ule)
Section 6.1.6 on
page 135
Performing an initial download via NMC-522 DownloadMan-
ager
Section 6.1.7 on
page 142
Adjusting a cavity coupler –
optional (cavity variant only)
Setting the output rating Section 6.2.2 on
page 144
Measuring and checking the carriers (impedance adjustment) Section 6.2.3 on
page 146
Table 6.2 Overview of the tasks to be performed (Configuring the software)
Tasks/work steps Described in
Preparatory measures Switching on the voltage source Section 6.1.2 on
page 132
Switching on the DIB-500 R4.1
Connecting the service computer to
the TIB transceiver module