User's Manual
Table Of Contents
- 1 Notes on the document
- 2 Safety regulations
- 3 Product description
- 3.1 Constituents
- 3.1.1 Voltage supply and alarming system
- 3.1.1.1 Terminal block
- 3.1.1.2 Expansion for VAC voltage supply (VAC voltage supply unit)
- 3.1.1.3 Alarm system expansion
- 3.1.1.4 SC200 - optional (VAC or alarm system expansion)
- 3.1.1.5 Alarm input/output module - optional (VAC or alarm system expansion)
- 3.1.1.6 Rectifier module - optional (VAC expansion)
- 3.1.2 E1 connection board
- 3.1.3 Redundancy package with LAN Routing Unit (LRU)
- 3.1.4 On/off switch
- 3.1.5 TIB transceiver module (TETRA Indoor Base)
- 3.1.6 Antenna Coupling System (ACS)
- 3.1.7 Fan unit
- 3.1.8 Cavity coupler (only for the Cavity variant)
- 3.1.9 Redundancy options for the DIB-500 R4.1 or the Base Station Function (BSF)
- 3.1.1 Voltage supply and alarming system
- 3.2 Interfaces
- 3.3 Wiring diagrams
- 3.4 Scope of delivery
- 3.1 Constituents
- 4 Transport and storage
- 5 Setup and commissioning
- 5.1 Safety measures and prerequisites
- 5.2 Tools, aids and materials
- 5.3 Installing equipment racks
- 5.4 Removing the top cover of the mounting frame
- 5.5 Connecting equipment racks (as of 5 carriers)
- 5.6 Connection to the electrical system
- 5.7 Connecting Ethernet cables
- 5.8 Installing the GPS antenna
- 5.9 Installing the GPS protector - optional
- 5.10 Connecting antennas
- 5.11 Connecting external alarm sensors (LSA+)
- 5.12 Connecting external alarms - optional, with VAC or alerting expansion
- 5.13 Mounting the top cover of the equipment rack
- 5.14 Switching on the voltage source
- 5.15 Switching on the DIB-500 R4.1
- 6 Configuration
- 6.1 Configuring the software
- 6.1.1 Work equipment
- 6.1.2 Preparatory measures
- 6.1.3 Deleting the ARP buffer
- 6.1.4 Configuring and generating network configurations via the NMC-515 ConfigurationManager
- 6.1.5 Creating the download repository
- 6.1.6 Adapting IP addresses (with more than one transceiver module)
- 6.1.7 Performing an initial download via NMC-522 DownloadManager
- 6.2 Adjusting a cavity coupler - optional (cavity variant only)
- 6.3 Concluding tasks
- 6.1 Configuring the software
- 7 Function tests and operating surveillance
- 8 Service interruption
- 9 Recommissioning
- 10 Maintenance
- 11 Component replacement
- 11.1 Safety measures and prerequisites
- 11.2 Overview of replacement components and tools, aids and materials
- 11.2.1 Replacing the TIB transceiver module (tools and aids)
- 11.2.2 Replacing the ACS (tools and aids)
- 11.2.3 Replacing components of the fan unit (tools, aids and materials)
- 11.2.4 Replacing the LRU (tools and aids)
- 11.2.5 Replacing the top hat rail power supply unit (tools and aids)
- 11.2.6 Replacing components of the mounting frame/the voltage supply unit (tools, aids and materials)
- 11.2.7 Replacing cavity couplers (tools and aids)
- 11.2.8 Replacing the GPS protector (tools and aids)
- 11.3 Replacing the TIB
- 11.4 Replacing the ACS
- 11.5 Replacing fan unit constituents
- 11.6 Replacing the LRU - optional (redundancy package)
- 11.7 Replacing the top hat rail - optional (redundancy package)
- 11.8 Replacing components of the VAC and alarm system expansion - optional
- 11.9 Replacing cavity couplers - optional (cavity variants only)
- 11.10 Replacing the GPS protector - optional
Installation, Operation and Service Manual 90DIB500R41IM_FCC02 – 99.1 103
DIB-500 R4.1 Setup and commissioning
Connecting equipment racks (as of 5 carriers)
Carry out the following steps:
Risk of injury
The equipment rack features sharp edges on the inside. Risk of injury if you do not wear
protective gloves.
➔ Always wear protective gloves for the following process steps.
Risk of electric shock
Electric shock when touching live parts. Hardware components in the equipment cabi-
net are live.
➔ When performing work in the equipment cabinet, ensure that the voltage source on
site is switched off. This must have been checked with a voltmeter.
1. Connect the voltage supply cable to the LRU according to the labeling, refer to Fig-
ure 5.10 on page 102.
2. Plug the LRU onto the top hat rail from above, refer to Figure 5.11 on page 102.
The catch must snap in audibly.
✓ The installation of the LRU has thus been completed.
5.5.1.4 Installing the top hat rail power supply unit
The top hat rail power supply unit must be connected to the top hat rail.
Figure 5.12 shows the position of the top hat rail power supply unit on the top hat rail.
Figure 5.12 Top hat rail power supply unit on the top hat rail
Proceed as follows to install the top hat rail power supply unit:
Preparation:
✓ The voltage source on site must be de-energised.
✓ The toggle switches must be set to the "Off" position ("downward" switch position).
✓ The top cover of the equipment rack must have been removed.