DIB-500 R4.1 Setup and commissioning
Safety measures and prerequisites
90 Installation, Operation and Service Manual 90DIB500R41IM_FCC02 99.1
5.1 Safety measures and prerequisites
For the setup and commissioning, the following safety measures and prerequisites must
be observed:
| All the supply lines/cables must be passed or suspended in a way ensuring that
the operation of the device is not impaired,
there are no trip hazards for the operator or any other persons,
the required minimum distances and cable lengths are complied with.
| The site must be prepared in compliance with the document "Site Requirements".
| The DIB-500 R4.1 may be set up and commissioned only of the required ambient
conditions are met at all times, see Table 4.1 on page 85.
| The safety regulations must be considered at all times, see chapter 2 on page 21.
| Observe all other activity-based safety measures and prerequisites in the activity
descriptions in this chapter.
| The required tools and materials must be available, see section 5.2 on page 90.
5.2 Tools, aids and materials
Table 5.2 provides an overview of the tools, auxiliaries and materials required for the
steps in this chapter.
Dimensioning cable lengths
For the dimensioning of cables, consider that the equipment rack may have to be
moved for maintenance work.
Connecting external alarms –
optional, with VAC or alerting
expansion
Removing the top cover of the equipment rack Section 5.12.1 on
page 124
Connecting external alarms Section 5.12.2 on
page 126
Mounting the top cover of the mounting frame Section 5.12.3 on
page 128
Mounting the top cover of the equipment rack Section 5.13 on
page 129
Switching on the voltage source Section 5.14 on
page 129
Switching on the DIB-500 R4.1 Section 5.15 on
page 129
Table 5.1 Overview of the tasks to be performed (Setup and commissioning)
Tasks/work steps Described in