User's Manual
Table Of Contents
- 1 Notes on the document
- 2 Safety regulations
- 3 Product description
- 3.1 Constituents
- 3.1.1 Voltage supply and alarming system
- 3.1.1.1 Terminal block
- 3.1.1.2 Expansion for VAC voltage supply (VAC voltage supply unit)
- 3.1.1.3 Alarm system expansion
- 3.1.1.4 SC200 - optional (VAC or alarm system expansion)
- 3.1.1.5 Alarm input/output module - optional (VAC or alarm system expansion)
- 3.1.1.6 Rectifier module - optional (VAC expansion)
- 3.1.2 E1 connection board
- 3.1.3 Redundancy package with LAN Routing Unit (LRU)
- 3.1.4 On/off switch
- 3.1.5 TIB transceiver module (TETRA Indoor Base)
- 3.1.6 Antenna Coupling System (ACS)
- 3.1.7 Fan unit
- 3.1.8 Cavity coupler (only for the Cavity variant)
- 3.1.9 Redundancy options for the DIB-500 R4.1 or the Base Station Function (BSF)
- 3.1.1 Voltage supply and alarming system
- 3.2 Interfaces
- 3.3 Wiring diagrams
- 3.4 Scope of delivery
- 3.1 Constituents
- 4 Transport and storage
- 5 Setup and commissioning
- 5.1 Safety measures and prerequisites
- 5.2 Tools, aids and materials
- 5.3 Installing equipment racks
- 5.4 Removing the top cover of the mounting frame
- 5.5 Connecting equipment racks (as of 5 carriers)
- 5.6 Connection to the electrical system
- 5.7 Connecting Ethernet cables
- 5.8 Installing the GPS antenna
- 5.9 Installing the GPS protector - optional
- 5.10 Connecting antennas
- 5.11 Connecting external alarm sensors (LSA+)
- 5.12 Connecting external alarms - optional, with VAC or alerting expansion
- 5.13 Mounting the top cover of the equipment rack
- 5.14 Switching on the voltage source
- 5.15 Switching on the DIB-500 R4.1
- 6 Configuration
- 6.1 Configuring the software
- 6.1.1 Work equipment
- 6.1.2 Preparatory measures
- 6.1.3 Deleting the ARP buffer
- 6.1.4 Configuring and generating network configurations via the NMC-515 ConfigurationManager
- 6.1.5 Creating the download repository
- 6.1.6 Adapting IP addresses (with more than one transceiver module)
- 6.1.7 Performing an initial download via NMC-522 DownloadManager
- 6.2 Adjusting a cavity coupler - optional (cavity variant only)
- 6.3 Concluding tasks
- 6.1 Configuring the software
- 7 Function tests and operating surveillance
- 8 Service interruption
- 9 Recommissioning
- 10 Maintenance
- 11 Component replacement
- 11.1 Safety measures and prerequisites
- 11.2 Overview of replacement components and tools, aids and materials
- 11.2.1 Replacing the TIB transceiver module (tools and aids)
- 11.2.2 Replacing the ACS (tools and aids)
- 11.2.3 Replacing components of the fan unit (tools, aids and materials)
- 11.2.4 Replacing the LRU (tools and aids)
- 11.2.5 Replacing the top hat rail power supply unit (tools and aids)
- 11.2.6 Replacing components of the mounting frame/the voltage supply unit (tools, aids and materials)
- 11.2.7 Replacing cavity couplers (tools and aids)
- 11.2.8 Replacing the GPS protector (tools and aids)
- 11.3 Replacing the TIB
- 11.4 Replacing the ACS
- 11.5 Replacing fan unit constituents
- 11.6 Replacing the LRU - optional (redundancy package)
- 11.7 Replacing the top hat rail - optional (redundancy package)
- 11.8 Replacing components of the VAC and alarm system expansion - optional
- 11.9 Replacing cavity couplers - optional (cavity variants only)
- 11.10 Replacing the GPS protector - optional
Installation, Operation and Service Manual 90DIB500R41IM_FCC02 – 99.1 IX
DIB-500 R4.1
6.1.6 Adapting IP addresses (with more than one transceiver module) . . . . . . . . 135
6.1.6.1 Adapting the IP addresses (IntelPC) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 135
6.1.6.2 Adapting the IP addresses (PowerPC) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 138
6.1.7 Performing an initial download via NMC-522 DownloadManager . . . . . . . . 142
6.2 Adjusting a cavity coupler – optional (cavity variant only) . . . . . . . . . . 143
6.2.1 Tools and aids . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 144
6.2.2 Setting the output rating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 144
6.2.3 Measuring and checking the carriers (impedance adjustment) . . . . . . . . . . 146
6.3 Concluding tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150
7 Function tests and operating surveillance . . . . . . . . . . . . . . . . . .151
7.1 Work equipment for function tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 152
7.2 Checking operating states . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 152
7.2.1 Checking operating statuses via the NMC-511 FaultManager . . . . . . . . . . . 153
7.2.2 Checking operating statuses via LEDs of the TIB . . . . . . . . . . . . . . . . . . . . 153
7.2.3 Checking operating statuses via LEDs of the SC200 or rectifier modules –
optional (only for VAC voltage supply) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 154
7.2.4 Checking operating states via SMT-500 . . . . . . . . . . . . . . . . . . . . . . . . . . . 155
7.3 Checking the reachability of network elements . . . . . . . . . . . . . . . . . . . 155
7.4 Checking voice channels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 156
7.4.1 Checking the voice channel (two carriers) . . . . . . . . . . . . . . . . . . . . . . . . . . 156
7.4.2 Checking the voice channel (more than two carriers) . . . . . . . . . . . . . . . . . 157
7.5 Checking standby carriers – optional . . . . . . . . . . . . . . . . . . . . . . . . . . . 158
7.6 Function tests and operating surveillance GPS . . . . . . . . . . . . . . . . . . . 159
7.6.1 Checking the installation site of the GPS antenna . . . . . . . . . . . . . . . . . . . . 159
7.6.2 GPS operational monitoring (via NMC-511 FaultManager) . . . . . . . . . . . . . 159
7.6.3 Function tests and fault analysis GPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 161