User's Manual
Table Of Contents
- 1 Notes on the document
- 2 Safety regulations
- 3 Product description
- 3.1 Constituents
- 3.1.1 Voltage supply and alarming system
- 3.1.1.1 Terminal block
- 3.1.1.2 Expansion for VAC voltage supply (VAC voltage supply unit)
- 3.1.1.3 Alarm system expansion
- 3.1.1.4 SC200 - optional (VAC or alarm system expansion)
- 3.1.1.5 Alarm input/output module - optional (VAC or alarm system expansion)
- 3.1.1.6 Rectifier module - optional (VAC expansion)
- 3.1.2 E1 connection board
- 3.1.3 Redundancy package with LAN Routing Unit (LRU)
- 3.1.4 On/off switch
- 3.1.5 TIB transceiver module (TETRA Indoor Base)
- 3.1.6 Antenna Coupling System (ACS)
- 3.1.7 Fan unit
- 3.1.8 Cavity coupler (only for the Cavity variant)
- 3.1.9 Redundancy options for the DIB-500 R4.1 or the Base Station Function (BSF)
- 3.1.1 Voltage supply and alarming system
- 3.2 Interfaces
- 3.3 Wiring diagrams
- 3.4 Scope of delivery
- 3.1 Constituents
- 4 Transport and storage
- 5 Setup and commissioning
- 5.1 Safety measures and prerequisites
- 5.2 Tools, aids and materials
- 5.3 Installing equipment racks
- 5.4 Removing the top cover of the mounting frame
- 5.5 Connecting equipment racks (as of 5 carriers)
- 5.6 Connection to the electrical system
- 5.7 Connecting Ethernet cables
- 5.8 Installing the GPS antenna
- 5.9 Installing the GPS protector - optional
- 5.10 Connecting antennas
- 5.11 Connecting external alarm sensors (LSA+)
- 5.12 Connecting external alarms - optional, with VAC or alerting expansion
- 5.13 Mounting the top cover of the equipment rack
- 5.14 Switching on the voltage source
- 5.15 Switching on the DIB-500 R4.1
- 6 Configuration
- 6.1 Configuring the software
- 6.1.1 Work equipment
- 6.1.2 Preparatory measures
- 6.1.3 Deleting the ARP buffer
- 6.1.4 Configuring and generating network configurations via the NMC-515 ConfigurationManager
- 6.1.5 Creating the download repository
- 6.1.6 Adapting IP addresses (with more than one transceiver module)
- 6.1.7 Performing an initial download via NMC-522 DownloadManager
- 6.2 Adjusting a cavity coupler - optional (cavity variant only)
- 6.3 Concluding tasks
- 6.1 Configuring the software
- 7 Function tests and operating surveillance
- 8 Service interruption
- 9 Recommissioning
- 10 Maintenance
- 11 Component replacement
- 11.1 Safety measures and prerequisites
- 11.2 Overview of replacement components and tools, aids and materials
- 11.2.1 Replacing the TIB transceiver module (tools and aids)
- 11.2.2 Replacing the ACS (tools and aids)
- 11.2.3 Replacing components of the fan unit (tools, aids and materials)
- 11.2.4 Replacing the LRU (tools and aids)
- 11.2.5 Replacing the top hat rail power supply unit (tools and aids)
- 11.2.6 Replacing components of the mounting frame/the voltage supply unit (tools, aids and materials)
- 11.2.7 Replacing cavity couplers (tools and aids)
- 11.2.8 Replacing the GPS protector (tools and aids)
- 11.3 Replacing the TIB
- 11.4 Replacing the ACS
- 11.5 Replacing fan unit constituents
- 11.6 Replacing the LRU - optional (redundancy package)
- 11.7 Replacing the top hat rail - optional (redundancy package)
- 11.8 Replacing components of the VAC and alarm system expansion - optional
- 11.9 Replacing cavity couplers - optional (cavity variants only)
- 11.10 Replacing the GPS protector - optional
Installation, Operation and Service Manual 90DIB500R41IM_FCC02 – 99.1 197
DIB-500 R4.1 Component replacement
Replacing components of the VAC and alarm system expansion – optional
The tasks listed in the following table must be performed to replace the mounting frame.
11.8.2.1 Preparatory measures
Before you can start with the replacement of the mounting frame, the preparatory tasks
listed in the following table must be performed.
Table 11.25 Overview of the tasks to be performed (Replacing the mounting frame and the SC200)
Tasks/work steps Described in
Preparatory measures Temporary service interruption Section 8.1 on
page 163
Removing the top cover of the mounting frame Section 5.4 on
page 94
Removing the top cover of the equipment rack Section 5.12.1 on
page 124
Disconnecting external alarms (via alarm input/output
module)
on page 198
Removing connections of the SC200 on page 199
Removing Plugs with Earthing Contact – optional (only
for VAC expansion)
on page 200
Uninstalling rectifier modules Section 11.8.1.1 on
page 193
Replacing the mounting frame
and the SC200
Removing the mounting frame on page 201
Preparing the mounting frame on page 203
Installing the mounting frame on page 204
Attaching connectors of the SC200 on page 206
Connecting external alarms Section 5.12.2 on
page 126
Concluding tasks Installing Plugs with Earthing Contact – optional (only for
VAC expansion)
on page 207
Mounting the top cover of the mounting frame Section 5.12.3 on
page 128
Mounting the top cover of the equipment rack Section 5.13 on
page 129
Recommissioning after a temporary service interruption Section 9.1 on
page 167
Configuring the SC200 Section 11.8.2.4 on
page 208
Table 11.26 Overview of preparatory measures (Replacing the mounting frame and the SC200)
Tasks/work steps Described in
Temporary service interruption Section 8.1 on
page 163
Removing the top cover of the mounting frame Section 5.4 on
page 94
Removing the top cover of the equipment rack Section 5.12.1 on
page 124
Disconnecting external alarms (via alarm input/output module) on page 198
Removing connections of the SC200 on page 199
Removing Plugs with Earthing Contact – optional (only for VAC expan-
sion)
on page 200