DIB-500 R4.1 Requirements concerning the operation room
Infrastructure
20 Site Requirements 90DIB500R41SR_FCC02 99.1
4.1.2 Requirements concerning the base
To ensure the proper operation of the product, the base must meet the following
demands:
| The floor of the operation room must be solid and level.
| The floor of the operation room must consist of fireproof materials.
| All the floors of the operation and access rooms must:
be designed to bear the mechanical load of the equipment rack, refer to the table
in section 4.1.3.1 on page 20.
Appropriate weight distribution measures must be taken as required, e.g. the use
of a supporting metal plate.
be designed for the mechanical loads of any lifting equipment used.
4.1.3 Required space
The following section describes the demands on the:
| Required space for the equipment rack/s of the product,
| Required space for the uninterruptible power supply/supplies (UPS).
4.1.3.1 Required space for the equipment rack/s of the product
The space required in the service room for an equipment rack depends on the actual
size of the equipment rack (please refer to the table below) and on the head space to be
added, e.g. for hinges and head space for service purposes.
For the service interruption and for recommissioning, the voltage source on site must be
accessible at all times.
Table 4.1 Dimensions and Weights
Supported carriers 1/2 3/4
5/6
1)
7/8
1)
Width Hybrid
600 mm
600 mm
Cavity
2)
High Power --- --- ---
FlexibleTx 600 mm --- ---
Height Hybrid 910 mm
Cavity
2)
1.530 mm
High Power 910 mm --- --- ---
FlexibleTx 910 mm --- ---
Depth Hybrid
600 mm
600 mm
Cavity
2)
High Power --- --- ---
FlexibleTx 600 mm --- ---
Weight Hybrid max. 80 kg max. 100 kg max. 180 kg max. 200 kg
Cavity
2)
max. 130 kg max. 150 kg max. 280 kg max. 300 kg
High Power max. 75 kg --- --- ---
FlexibleTx max. 75 kg max. 95 kg --- ---
1) consisting of two collocating equipment racks (dimensions according to the respective variant)