DS-6210VC4 Base Station Owner's Manual Installation
38
z All modules have been installed.
z The external power has been installed and all cables have been connected.
z All switches of the power distribution box are set to OFF.
3.8.2 Examining the Cabinet
The following requirements shall be met after installation.
No. Check Item
1 The position of the cabinet should conform to the design drawing.
2 All modules should be installed correctly.
3 All cables within the cabinet should be connected properly.
4 The side door should be installed and the grounding cables should be connected properly.
5
All screws should be tightened. Be sure to put flat washers and spring washers on all bolts
correctly.
6 The cabinet should be placed horizontally and orderly.
7
The surface of the cabinet should be clean and well painted. No dust and other sundries are in
the cabinet.
8 All labels should be correct, clear and not be missed.
9 The plastic dust cap on top of the cabinet should be installed properly.
Table 3-4 Checklist of Cabinet Installation
3.8.3 Examining Cables
The following requirements should be met after connection.
No. Check Item
1 All cables should not be damaged.
2 All cables are one-piece cables, without any joint in the middle.
3 Excess grounding cables should be cut off.
Table 3-5 Checklist of Cables