Installation Guide

LED VAPOR LIGHT
INSTALLATION INSTRUCTIONS
WARNINGS AND CAUTIONS
Make sure that the supply voltage corresponds to the 
rated product voltage.
If the product is damaged, do not use it.
All wiring connections should be capped with UL 
approved wire connectors.
For ceiling or suspended mount there are two stainless 
steel surface brackets included.
This  fixture  is  intended  to  be  connected  to  a  properly 
installed  and  grounded  UL  listed  junction  box  with 
suitable strain relief means for power cord. The junction 
box is not included, should be purchased separately.
www.hyperikon.com
info@hyperikon.com
707 Broadway Suite 800 
San Diego, CA 92101
(888) 846-4973
Remove the fixture and the mounting package from the box and make sure that no parts are missing by referencing the 
illustrations on the installation instructions.
GENERAL: All electrical connections must be in accordance with local and National Electrical Code (N.E.C.) standards. 
Installation must be performed by a qualified installer.
1. Open the cover of junction box on the back of lamp.
2.  Insert  a  power  cord  (SVT  300V  150°C  18AWGx3c) 
through a special hole at the end of the lighting fixture.
3. Connect the power cord (Live wire, Neutral wire and 
Ground  wire)  to  the  terminal  box  from  the  lamp 
correspondingly.
4. Affix the cover of the junction box.
5. Affix the mounting brackets to the ceiling/wall.
6.  Affix the  lamp  body  to  the  ceiling/wall  with  mounting 
brackets.
7. Connect power cord of VaporProof lamp to the nearest 
junction box of power. 
INSTALLATION INSTRUCTIONS
PLEASE READ CAREFULLY AND SAVE THESE INSTRUCTIONS, AS YOU MAY NEED THEM AT A LATER DATE.
NOTE: DAISY CHAIN LINKING ALLOWED FOR A MAXIMUM OF 12 40W VAPOR LIGHTS AND 7 70W VAPOR LIGHTS.
820±5mm
1
2
3
4
5
6
7
VAPOR

