Spec Sheet
Table Of Contents
- Introduction
- Background
- In-Rush Current
- SureStart In-Rush Reduction
- Hard Start kits vs. SureStart
- The SureStart Difference
- Increasing Utility Regulation
- Off-Grid & Generators
- Generator Sizing Methods
- SureStart Operation
- Led Flash Codes
- SureStart Operation Flow Chart
- Model Nomenclature
- Selection Example
- Dimensional Data
- Approved Mounting Positions
- Characteristics
- Application Notes
- SureStart Compatibility Guide
- Wiring Schematics
- Declaration of Conformity
- Definitions
Page 18
Declaration of Conformity
SureStart technology has been tested and certifi ed under the following standards that apply.
For United States, Canada, & Mexico
UL 508/ CSA 22.2 # 14 (ETL control # 4004190)
For European Union, Australia, and other countries accepting CE Marking
Low Voltage Directive (LVD)
IEC/ EN 60947-4-2: Low Voltage switchgear and control gear: contactors and motor-starters
IEC/ EN 60335-1 & IEC/ EN 60335-2-40: Safety requirements for electrical heat pumps, air conditioners, dehumidifi ers.
Electromagnetic Compliance (EMC)
IEC/ EN 55014-1 Conducted & radiated emissions
IEC/ EN 61000-3-11 Flicker
IEC/ EN 61000-3-12 Harmonics emissions
IEC/ EN 61000-3-2 Harmonic current emissions
IEC/ EN 55014-2 Conducted & radiated immunity
IEC/ EN 61000-6-1 Immunity for residential, light commercial, and light industrial
IEC EN 61000-3-3 Voltage fl uctuations
IEC/ EN 61000-4-2 Electrostatic discharge (ESD) immunity test
IEC/ EN 61000-4-3 Radiated, radio-frequency, electromagnetic fi eld immunity test
IEC/ EN 61000-4-4 Electrical fast transient/burst immunity test
IEC/ EN 61000-4-5 Surge Immunity Test
IEC/ EN 61000-4-6 Conducted radio-frequency immunity
IEC/ EN 61000-4-11 Voltage dips, short interruptions, and voltage variations immunity tests
EMC compliance tested in accordance with:
ANSI C63.4
EN55022 + A1:2000 + A2:2003
CISPR16 and CISPR22
VCCI V-3/2007.04