Installation Guide

6
1) Place the tub in the exact position of final installation. The bathtub cannot be repositioned once it is
plumbed and installed. The tub is designed to sit on top of the finished floor, however, you may need to
leave an area by the drain open until installation of the drain is complete.
2) Ensure location is structurally sound, flat and level.
3) Elevate the tub to allow access to the bottom of the tub from the drain to the overflow area. The tub is
very heavy; use appropriate supports.
4) Temporarily “dry fit” the drain kit and trim the pipes to proper length. Note the distance from the edge of
the tub to the center of the overflow pipe. This measurement will be used to verify the location of the hole
in the floor for the overflow pipe. Also see rough-in dimensions on previous page.
5) Remove the drain kit from the tub.
6) Use emery cloth, grinder or wire brush to remove the plated finish from the pipe where it will be soldered
to the ‘tee’.
7) Provide opening in floor below drain of approximately 6” x 6”. This will be completely covered by the tub.
Note: This is a sub floor drain. Access from below tub is recommended for installation. If there is no access from
below, the installation is more difficult. Clearance for the drain will be required and the floor near the overflow will
need to be completed after the drain is installed. See picture below.
Drain kit parts breakout is shown in illustration to the right.
INSTALLATION INSTRUCTIONS FOR SOAKING WITHOUT PEDESTAL
Hydro Systems recommends using clear 100% silicone sealant,
DO NOT use plumber’s putty.
Bell Flange
T-Piece
Drain Stopper Assembly
Waste Flange Assembly
Drain Shoe
Cover
Clamp Plate
Ferrule
Overflow
m etS tloB xeH
Assembly
TOWER
A Tower can be added to any of our Metro Bathtubs allowing
you to use traditional Roman faucets.
WASTE AND OVERFLOW
The Metro Collection offers integral waste and overflow on all models.
Use care when selecting your drain kit. The Metro Collection offers toe tap hardware standard.