User Guide

353326 6/06 2-7
Hopper Assembly 353219
NOTES:
1. Door to be flush with top surface of hopper assembly. Adjust door until
sides align evenly with hopper. If needed, continue to adjust door until
door assembly rests against the hopper in the closed position. Finish
installing linkage.
2. Rotate handle several times to ensure proper opening and closing of
door assembly, adjust as required.
3. Adjust 374843 (Close Out Plate) to close gap between front assembly
and door assembly see ‘Chapter 2, ‘Hopper Front Assembly” on
page 2-2
INDEX
NO.
SERVICE
PART NO.
MFG. PART
NO.
QTY. DESCRIPTION
1 064329 064329 4 CS .250-20 X .625 HX G5 ZN
2 017079 017079 4 FW .250 X .560 X.04 SAE ZN
3 443549 443549 4 PIVOT BEARING DISC
4 011387 011387 4 CP .125D X 1.250 LG HML ZN
5 741264 741264 1 MADE IN U.S.A.-COMBO DECAL
6 758532 758532 2 BAC VAC ID DECAL