Operation Manual
English - 63
7. GARDEN EXAMPLE - PROPOSED INSTALLATION
Area: 0.85 acre (3500 m
2
). U-shaped garden
with the charging station placed on one of the
large open areas. Guide wire recommended
through the passage.
Timer: Operating time of 10 hours per day.
Exit angles: 90° - 270°.
Follow loop out: Direction Guide 1, Distance
25 meters (80 ft) and Proportion 30 %.
Search method: Irregular and Follow guide
wire in.
Delay: Guide1, 2 minutes, Guide2, 2 minutes
and boundary wire 99 minutes. Automower
®
is never permitted to follow the boundary
wire.
Corridor width: Guide1 6
Area: 1.4 acre (6000 m
2
). Rectangular
garden with the charging station placed by an
island. A large part of the boundary wire is
routed on a slope that is steeper than 10 %.
Guide wire recommended.
Timer: Operating time of 24 hours per day.
Exit angles: 90° - 270°.
Search method: Irregular and Follow guide
wire in.
Delay: Guide1, 2 minutes, Guide2, 2 minutes
and boundary wire 99 minutes. Automower
®
is never permitted to follow the boundary
wire.
Corridor width: 19
Area: 0.75 acre (3000 m
2
). There is a number
of islands. No guide wire is required.
Timer: Operating time of 15 hours per day.
Exit angles: 90° - 270°.
Search method: Irregular.
Delay: Guide1, 2 minutes, Guide2, 2 minutes
and boundary wire 11 minutes.
Corridor width: Boundary wire 20
Proposals for installation and settings