Installation Guide
Avoid placing seams in high-trac areas . Floor should be
scraped and swept free of debris and have any
residues, paint or other chemicals cleaned o the oor.
When unrolling and positioning material,
it is recommended to double cut the seam.
Seam tape is suggested to hold the
material until adhesive can be applied.
Adhesive should cover 100% of the exposed oor, leaving no gaps or puddles. Allow 5-10 minutes to
ash o excess moisture, allowing it to acquire sucient tack to hold material to the oor.
Do not allow adhesive to dry overlong before applying the material, as it will inhibit good bonding.
WALL-TO-WALL INSTALLATION
CABINET
CABINET