Instructions / Assembly

Using help (second person) lift workbench up and
rotate onto leveling feet FF and GG. Do not rest on
side of legs while rotating workbench to its upright
position. Damage could occur.
• Place the workbench in its upright position.
Move workbench to desired location and adjust level-
ing feet FF and GG to make workbench level and
secure. (See operation.)
Leveling Foot Adjustment
Adjust leveling foot to desired position with athead
screwdriver or 7/16in open end wrench as shown.
Process:
Position frame assembly on Workbench Top,
as desired.
NOTE: The back of the work bench frame must be at
least 1-1/2 inches (38 mm) from the back of the
Workbench Top.
• Mark centers of (6) mounting holes.
• Remove workbench frame in order to drill pilot holes.
Drill (6) 1/8in pilot holes 1/2in deep in mounting
hole locations.
Reposition workbench assembly on Workbench Top.
Attach using (6) Hex Screws DD.
NOTE: Additional fasteners may be used to attach
workbench top through holes in side support if desired.
(Not supplied)
Process:
Attach rail E in top back set of holes in both sides A as
shown, using (4) bolts AA, (4) washers BB, and (4) nuts
CC. Flanges of Rail E should point in.
• Finger tighten.
IMPORTANT:
YOU MUST SQUARE THE UNIT AND
WRENCH TIGHTEN ALL FASTENERS TO
ENSURE STABILITY.
BOTTOM RAIL ASSEMBLY
Items Needed:
E - Bottom Rail (Qty: 1)
AA - 1/4-20 x 5/8in Carriage Bolt (Qty: 4)
BB - 5/16in Washer (Qty: 4)
CC - 1/4-20 Flange Nut (Qty: 4)
Figure 3
Flanges
point in
Back
Front
Bottom Rail
BB
AA
CC
4
OPERATION
REMOVING PROTECTIVE FILM FROM
STAINLESS STEEL
Starting at one of the corners, peel back the protective
coating from the stainless top.
Be sure to remove all the protective coating before
initial use.
Follow the cleaning methods in thev maintenance sec-
tion to keep the stainless looking new.
TOP ATTACHMENT
Items Needed:
C - Workbench Top
DD - #14-10 x 5/8in Hex Screw (Qty: 6)
Drill
1/8in Drill Bit
Mounting Holes
Figure 4
1-1/2 inches
38 mm