Instructions / Assembly

Process:
Place (1) leveling foot pad FF and (1) leveling foot pad
GG on each side at the bottom. Make sure each leveling
foot is fully seated on each corner.
Secure each Leveling Foot with (1) bolt AA, (1) Washer
BB and (1) Nut CC.
Wrench tighten.
Assemble (1) leveler EE in each leveling foot. Some
adjustments may be necessary after workbench is in
desired position.
SIDE CONSTRUCTION
Items Needed:
A - Side (Qty: 2)
AA - 1/4-20 x 5/8in Carriage Bolt (Qty: 4)
BB - 5/16in Washer (Qty: 4)
CC - 1/4-20 Flange Nut (Qty: 4)
EE - Screw Leveler (Qty: 4)
FF - Leveling Foot, Left (Qty: 2)
GG - Leveling Foot, Right (Qty: 2)
Items Needed:
B - Rail - Top Back (Qty: 1)
D - Rail - Top Front (Qty: 1)
AA - 1/4-20 x 5/8in Carriage Bolt (Qty: 8)
BB - 5/16 Washer (Qty: 8)
CC - 1/4-20 Serrated Flange Nut (Qty: 8)
3
ASSEMBLY
Figure 1
Figure 2
Process:
Place Workbench Top, with stainless steel side facing
down. (Use packaging material to prevent scratches.)
NOTE: The Rail with the Husky® nameplate should be
placed toward the front of the unit with the nameplate
position upside down.
Assemble (2) sides A and rails B and D, as shown using
(8) bolts AA, (8) washer BB, and (8) nut CC. Holes on
rails should be facing to the outside of the workbench top.
• Finger tighten.
TOP RAIL ASSEMBLY
Holes
facing out
Back
Front
Leveler
(on top)
D
A
B
CC
BB
AA