Instructions / Assembly

6
DOOR CONSTRUCTION
Items Needed:
GG - #10-24 Hex Nut (Qty: 8)
FF - 3/16in Washer (Qty: 8)
NN - Left Hinge (Qty: 2)
PP - Right Hinge (Qty: 2)
EE - #10-24 Carriage Bolt (Qty: 8)
E - Door Left (Qty: 1)
F - Door Right (Qty: 1)
Process:
Attach the NN and PP Hinges to the Doors using (8)
EE, (8) FF, and (8) GG. Wrench tighten.
Note: The hinges for both doors MUST be mounted so the
Hinge Pin points UP at the TOP of the door and DOWN at
the BOTTOM of the door.
Make sure to insert hinges through slots.
Figure 8
Left side door shown
GG
EE
NN
FF
EE
FF
GG
PP
Top
Figure 8.1
Bottom
AA
RR
CC
DD
Figure 9
Process:
Slide the left door hinge pin PP into the lower hinge plate
RR.
Slide the hinge Plate RR onto the upper door hinge pin
NN. (Figure 9.1)
Attach the left door E by mounting the upper hinge RR,
using (2) AA, (2) CC and (2) DD.
Attach the right door F in the same manner.
Adjust Doors for optimum performance before tightening
screws.
DOOR HINGE ATTACHMENT
Items Needed:
AA - 1/4-20 x 5/8in Carriage Bolt (Qty: 4)
CC - 5/16-in Washer (Qty: 4)
DD - 1/4-20 Serrated Flange Nut (Qty: 4)
RR - Hinge Plate (Qty: 2)
Figure 9.1
RR
NN
E