- Hammer
- Pencil
For concrete, cinderblock or brick installation, use a hammer drill with chiseling ability ½” x 16”
long and a chisel bit 1” thick.
Key Installation Facts
1) Unit must be installed at floor level up to 3” off the floor.
2) Unit should be installed as far away as possible from the source of replenishment air.
3) Outside duct must be no less than 6” and dedicated for the HCS Unit only.
4) A sufficient replenish air passage must be provided between the location where the unit is
installed and the remaining part of the house or apartment.
5) The area within a radius of 4 feet around the unit should be clear to allow the air to be pulled
into the vents.
6) Unit should not be installed within 8 feet of combustion appliance.
IMPORTANT What Not to Do
1) DO NOT install the unit more than approx. 3 inches off the floor.
2) DO NOT make more than one turn with the duct and the ductwork should not be longer than 3
feet in total, unless rigid ducting is used - see “Ducting”, Page 11.
3) DO NOT crush the vinyl Pipe.
4) DO NOT install the unit next to a replenishment air supply.
5) DO NOT install the unit within 8 feet of a heat source (Radiator, heater, etc…).
6) DO NOT install in remote closed off areas or where there are obstructions to the airflow.