(1) Types of railway lines according to modulus 413.0202
P 300 High-speed traffic 300 km
P 230 Passenger traffic line (upgraded) 230 km
M 230 Mixed traffic line (upgraded) 230 km
P 160 Passenger traffic line (I+II) 160 km
M 160 Mixed traffic line 160 km
G 120 Freight transport line 120 km
R 120 Regional transport line 120 km
G 80 Regional transport line 80 km
G 50 Freight transport line 50 km
(2) Dynamic deflection modulus: For conditions of use see article 6; paragraph 5 for subgrade:
1. Value for coarse-grained soil
2. Value for mixed and fine-grained soil
(3) This thickness assumes a hydraulically bound base course of at least 30 cm under the solid track.
(4) as well as coarse-grained soils, gravels and sands with wide or intermittent grain size distribution; see modulus 836.0503, article 3
(5) when improving lines for high-speed traffic
Extract from German standard RIL 836 - Deutsche Bahn AG
836.501 RIL 836- Earthwork structures – design, construction and maintenance
Seite 10 Standard for embankments and cuttings
11.2 RIL 836 – German National Railway Company Deutsche Bahn AG
Requirements for railway track substructure under embankments or cuttings
Type of railway line Top soil Protective layer Subgrade general assembly
Material mix
Standard thickness
[cm]
area affected by frost
Line category
1)
Track ballast [MN/m
2
] (-) I II III [MN/m
2
] embankment cutting
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Ballast track
120 50 KG 1/2 1,00 70 70 70 80 40/35 A 1.1 A 1.3
P 300
Solid track
120 50 KG 2 1,00
3)
40
3)
40
3)
40
60 35/30 A 1.2 A 1.4
120 50 KG 1/2 1,00 50 60 70 60 40/35 A 1.9 A 1.7
P 230
M 230
120 50 KG 2 1,00
3)
40
3)
40
3)
40
60 35/30 A 1.6 A 1.8
P 160, M 160
G 120, R 120
100 45 KG 1/2 1,00 40 50 60 45 35/30 A 1.9 A 1.10
New construction
R 80, G 50
all other lines
80 40 (KG 1/2)
4)
1,00 30 40 50 45 30/25 A 1.11 A 1.12
80 40 KG 1/2 1,00 30 40 50 45 30/25 A 1.13 A 1.13
P 230
M 230
100 45 KG 2 1,00
3)
40
3)
40
3)
40
45 30/25 A 1.14 A 1.14
P 160, M 160
G 120, R 120
50 35 KG 1/2 1,00 20 25 30 30 25/20 A 1.15 A 1.15
R 80, G 50
all other lines
40 30 (KG 1/2)
4)
0,97 20 20 20 20 25/20 A 1.16 A 1.16
Maintenance Improvement
Ballast track
Solid track
Ballast track
Ballast track
Ballast track
Solid track
Ballast track
Ballast track
5
)
D
pr
E
v2
acc. attachment 1, figure
E
vd
2)
E
v2
E
vd
2)
The test must be performed and evaluated according to German standard TP BF StB Part B 8.3.