Installation Instructions
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Introduction
- Ch 2 - Adding cards to the Controller
- Unpacking the System Controller
- Unpacking the picocells
- System Controller card configuration
- Adding cards to the System Controller (first steps)
- Jumper and DIP switch settings
- Attaching bus cables
- Adding cards to the System Controller (final steps)
- Configuring Controller cards
- Verifying the card configuration
- Ch 3 - Installing the Controller
- Ch 4 - Verifying the Controller configuration
- Ch 5 - Configuring the router
- Ch 6 - Testing picocells
- Ch 7 - Installing picocells
- Ch 8 - Connecting to external equipment
- Ch 9 - System testing
- Ch 10 - Installation inspection
- Ch 11 - Provisioning
- Ch 12 - Remote Client
- Ch 13 - Troubleshooting
- Ch 14 - Maintaining Quad T1 cards
- App A - Specifications
- App B - Standards compliance information
- App C - Part numbers
- App D - Updates and backups
- Index
1026209–0001 Revision B 3–4 Installing the Controller
Mount the System Controller chassis to the rack as follows:
1. Choose a location in the rack that allows easy access to the
monitor, keyboard and rear of the Controller.
2. Position the Controller on the vertical side rails of the rack.
3. Secure the Controller to the front of the rack using the eight
provided mounting screws. See Figure 3-2, which shows the
screw holes on each side of the chassis (front).
Figure 3-2 Installing the chassis
G-17420 F
10/04/99
4. Tighten the mounting screws.
3.2
Mounting the
Controller chassis