Installation Instructions
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Introduction
- Ch 2 - Adding cards to the Controller
- Unpacking the System Controller
- Unpacking the picocells
- System Controller card configuration
- Adding cards to the System Controller (first steps)
- Jumper and DIP switch settings
- Attaching bus cables
- Adding cards to the System Controller (final steps)
- Configuring Controller cards
- Verifying the card configuration
- Ch 3 - Installing the Controller
- Ch 4 - Verifying the Controller configuration
- Ch 5 - Configuring the router
- Ch 6 - Testing picocells
- Ch 7 - Installing picocells
- Ch 8 - Connecting to external equipment
- Ch 9 - System testing
- Ch 10 - Installation inspection
- Ch 11 - Provisioning
- Ch 12 - Remote Client
- Ch 13 - Troubleshooting
- Ch 14 - Maintaining Quad T1 cards
- App A - Specifications
- App B - Standards compliance information
- App C - Part numbers
- App D - Updates and backups
- Index
1026209–0001 Revision B 1–10 Introduction
Leave Site
No
Verify RF Coverage
Ye s
Ye s
No
Finish
Send QA Inspection &
Operational Performance
Checklists to AIReach OS
Installation Manager
No
Ship Failed Picocell
to MRC
Receive Replacement
Picocell from MRC
Permanently Install
Scanning Picocell
Connect
Controller to PBX
and Dial-up Modem
Install SSL
Certificate
Discrepancies
Correct Identified
Discrepancies
Perform Installation
QA Inspection
Correct Identified
Discrepancies
Send "As-Built"
System Configuration
Report to
Network Planning
Enter Subscriber Data
Into Controller
(Provisioning)
Provide On-Site
Customer Training
and Support
Customer Accept
AIReach OS
Discrepancies
Ye s
Test Picocell
Performance
Picocell
Failure
B
From previous page
From previous page
2/17/00
T0001031
A
Conduct
Performance Test
Permanently Install
Traffic Picocells
Initiate Frequency
(24 Hour Minimum)
Band Scan
Figure 1-5 Flow chart: AIReach OS major installation and test tasks (Continued)