Installation Manual

1027144–0001 Draft – Revision D.01 7–4 Commissioning the RT
RT installation
This section describes how to use the LCD and buttons on the
CCM front panel (figure 7-2). You need to use the LCD to
commission the RT.
The LCD:
Shows CCM startup diagnostics (SUDS) tests as they occur
Shows the system boot up sequence
Shows the software loading sequence
Indicates the status and operational state of system
components
Provides functions necessary for commissioning the RT
Figure 7-2 CCM front panel LCD
rt060
LCD
TM
BROADBAND
ENTER
Main Menu
Install
7.3
Front panel LCD
operation