User's Manual

1027144–0001 Draft – Revision D.01 3–26 Installing indoor RT equipment
RT installation
Test the CCM for proper operation, as follows:
1. Apply power to the IDU chassis.
2. Observe the LEDs on the CCM front panel:
- Green – CCM startup and normal operation
- Red – Failure
3. Also observe the CCM startup diagnostics (SUDS) on the
CCM’s front panel LCD:
SUDS start on powerup. While they run, the CCM front
panel shows the following messages, in the sequence
shown.
Equipment function is normal when you see the
messages shown below and no failure messages.
Initial powerup
SUDS CPU Reg OK
SUDS DRAM OK
CPU registers and dynamic
RAM are tested.
Timer test
SUDS Timer Test
Timers are tested.
Watchdog timer test
SUDS WDT Test
The watch dog timer
is tested.
PCI test
SUDS PCI Test
The PCI controller is tested.
Static dual port RAM test
SUDS SDPRAM Test
Static dual port RAM is tested.
Serial port 1 test
SUDS Ser 1 Test
Serial port 1 is tested.
CCM power–on test
(SUDS)