User's Manual
Table Of Contents
RT INSTALLATION
1027144–0001 Draft – Revision D.01
Installing indoor RT equipment 3–1
RT installation
Chapter 3
Installing indoor RT equipment
This chapter includes:
• Rack grounding
• Installing indoor units (IDUs)
• Power supplies – page 3–8
• Installing the CCM – page 3–24
• CCM power–on test – page 3–26
• SSIs – page 3–28
• Installing expansion IDUs (EIDUs) – page 3–34
For IDU standards compliance information, see appendix B
(page B–3).
All of the tasks in this chapter are done inside.