User's Manual
Table Of Contents
1027145–0001 Revision D Installing indoor hub equipment 6–5Hub installation
Figure 6-3 Installing lag bolts into a wood floor
hb029
Rack
mounting
bracket
Metal washer
Isolation
shoulder
washer
Isolation
pad
Floor
Wood floor
Minimum depth:
2 inches
(5 centimeters)
Lag bolt
14. Place the washers shown in figure 6-3 onto the lag bolt.
CAUTION
When installing the isolation shoulder
washer, make sure the shoulder seats
completely into the metal floor mounting
bracket. Isolation may be compromised if
this washer is damaged or improperly
installed.
15. Use a ratchet wrench and 3/4–inch socket to tighten the lag
bolt.