User's Manual

HUB INSTALLATION
10271450001 Revision D Installing indoor hub equipment 6–1Hub installation
Chapter 6
Installing indoor hub equipment
This chapter includes:
Installing the hub rack – page 6–2
Installing indoor units (IDUs) – page 6–7
Power supplies – page 6–11
Installing the CCM – page 6–26
SSIs – page 6–28
Connecting the IFL to the CCM – page 6–32
CCM redundancy bus cable – page 6–33
Front panel LCD operation – page 6–34
CCM power–on test – page 6–36
Checking component status – page 6–39
For IDU standards compliance information, see appendix B
(page B–3).